Three Bridges ETE Design

This project included electrical designs for the reinforcement of DC Track Feeder cables directly connected to substations and Track Paralleling Huts (TPH) and also the along track / open route cabling.

A combined electrical Form A/B design submission was prepared for each electrical section which included:

  • Conductor rail layout drawings
  • Comprehensive track diagram updates
  • Negative bonding layouts
  • Designer risk assessment
  • Design Statements