Manchester Metrolink

Manchester's Metrolink light rail system was commissioned in 1992 running from Bury in the North to Altrincham in the South via the City Centre with a spur to Piccadilly main line station.

Antagrade provided site installation management and installed the complete fixed traction power supply equipment at twelve substations form the 6.6kV or 11kV incoming supply to the 750VDC traction output to the OLE.

Our scope of work included installation and jointing of the underground cables in the City Centre and trackside cables elsewhere together with the traction current return bonding.